Hi experts;
I have an issue with changing the existing batch determination for a production order components. I searched a lot in the forum, but failed to resolve the problem.
Following are the existing configuration settings;
Condition type : Order type / Plant / Material
Batch Class characteristic value - MCH1_LWEDT
Sort sequence characteristic value - MCH1_LWEDT
Instead of sorting all batches on above conditions, i want to sort batches on the basis of expiry dates.Then i have changed the class and sort sequence as below.
Condition type : Order type / plant / Material
Batch Class characteristic value : LOBM_VFDAT
Sort sequence characteristic value : LOBM_VFDAT
Then i changed the all components materials in COB2 and tested. But it is not working for some materials.
Could you please explain me the possible reasons for the error and do i need to do any master data changes?
Thanks & Regards;
Malka